1. Few wind and solar projects required significant federal permits between 2010 and 2021 3
2. Federal permitting durations have decreased in the past 15 years 4
3. Most wind and solar projects are only contested at the state or local level 5
4. Local ordinances constrain where and how clean energy projects are developed 6
5. More than 300 counties have banned or instituted moratoria on wind or solar projects 7
6. More than one thousand projects are withdrawn from the interconnection queue every year 8
7. Interconnection has been getting slower over the past 20 years 9
8. There is more energy storage and generation capacity in the queue than operating online 10
Selected Hamilton Project papers on climate and permitting reform 11
Technical appendix 14
References 17