목차
1. Background on the Navy’s Large Surface Combat Program
2. The Fallacy of Tonnage and Cost
3. Existing Power and Propulsion Systems Need a Reconfiguration
4. Mission-Led Requirements for Systems Installation
5. Industry’s Constraints Need to Be Integrated into the Navy’s Plan
6. Recommendations
7. Conclusion