목차
Executive Summary 06
01. Introduction and context 11
1.1 Reporting period 15
1.2 System boundaries 16
1.2.1 Organisational boundaries 16
1.2.2 Operational boundaries 17
1.2.3 Changes from the ex ante report 22
1.3 Methodology 23
1.3.1 Data inventory and assumptions 23
1.3.2 Calculation principles 23
1.3.3 Methodology for the Qatar 2022 stadiums 24
1.3.4 Global Warming Potential (GWP) 25
02. Results 26
2.1 Emissions per scope (all three phases) 28
2.2 Emissions per category and event 29
2.3 Emissions per phase 31
2.3.1 Preparation phase 32
2.3.2 FIFA World Cup phase 34
2.3.3 Post-tournament phase 36
2.4 Hotspot emissions 37
2.4.1 Emissions from travel 37
2.4.2 Emissions from accommodation 39
2.4.3 Emissions from infrastructure construction and operation 41
2.5 Comparison between ex ante and ex post reports 45
03. Bibliography 47
04. Annexes 49
Annexe I Emission factors 50
Annexe II Assumptions and data sources 51
Travel 51
Accommodation 54
Temporary facility construction and demounting 57
Stadium construction and demounting 57
Stadium operations 57
Impressum 58