목차
Title page
Contents
Acknowledgements 2
Executive Summary 3
1.0. Introduction 7
2.0. Monitoring Methods 10
2.1. What to Monitor 10
2.2. How to Monitor the CO₂ Impacts of Public Procurement 12
3.0. Challenges in Monitoring GPP Impacts 16
4.0. Case Studies 19
4.1. South Korea 19
4.2. Japan 22
4.3. Slovenia 23
4.4. Denmark 27
4.5. Malaysia 28
4.6. The Netherlands: Using the CO₂PL in assessing CO₂ emissions in both suppliers and procuring authorities 30
5.0. Conclusion and Recommendations 33
References 35
Table 1. Key indicators and data sources for monitoring GPP 10
Table 2. Methods, tools, and data sources for monitoring and measuring GHG emissions originating from GPP 13
Table 3. Example of the calculation of the reduction in environmental costs for personal computers, 2009-2013 21
Table 4. Example of the calculation of impact reduction obtained with green purchases for copying equipment in 2016 23
Table 5. Example of the calculation of impact reduction obtained with green purchases for indoor lighting sources in 2017 30
Figure 1. The Ladder System 15
Boxes
Box 1. The CO₂ Performance Ladder: A comprehensive tool for GPP and carbon emissions management 14
Box 2. Environmental impact calculation of GPP in South Korea 20
Box 3. Environmental impact calculation of GPP in Japan 22
Box 4. Environmental impact calculation of GPP in Slovenia using the example of the design and/or construction of buildings 25
Box 5. Sustainability impact calculation of GPP in Malaysia 29
해시태그
관련자료
AI 100자 요약·번역서비스
인공지능이 자동으로 요약·번역한 내용입니다.
Monitoring progress in green public procurement : methods, challenges, and case studies
(녹색공공조달 진행상황 모니터링 : 방법, 과제 및 사례 연구)